Installation Recommendations
 
page 1 - page 2 - page 3 - page 4
 

The Hep2O® pipe should be fed into position at the same time as the conduit system is installed i.e. before screeding. The conduit system should not be installed on sub-floors a long time in advance of screeding as damage by site traffic could occur.

The junction box is designed to gain access to pipe fittings, and to allow pipe cross-overs (which are normally undesirable within the floor screed material). Dimensions are shown in Figure No. 34.

If required the junction box can be cut in half and installed up against a wall (Figure No. 35).

The junction box should be drilled using a hole cutter or spade bit, to allow the conduit to fit snugly and click into position to protrude not less than 5mm inside the box. The correct drill size is shown in Table No. 7.

Figure No. 33. Conduit Junction Box HX100 NB: The prevention of cold water becoming warm is a Water Byelaw requirement.  
Note: Central heating pipework should not be run within the same junction box as cold water pipework unless there is sufficient space to fix adequate thermal insulation, in order to prevent the warming of cold water. Figure No. 34 Junction Box Dimensions Figure No. 35 Cut Junction Box 
Figure No. 34. Junction Box Dimensions Figure No. 35. Cut Junction Box
N.B:
1. All dimensions are nominal.
2. Lid recess is designed for 8mm thick plywood.