SlimLine
Hep2O®
Insert a blanking plug (HX41) directly into the fitting. When
ready to continue, drain the system, cut off the top of the
blanking plug where indicated and attach the next fitting.
Note:
Stainless steel blanking caps will not work correctly in Hep2O®fittings with BiTite®
grab wedges inside.
Demountable
Hep2O®
Remove the cap and grab wedge from the fitting. Push the open
end of the blanking peg (HX44) into the 'O' ring. Replace the
cap hand tight.
Removing
the Blanking Peg Remove the cap and blanking peg, re-insert
the 'O' ring and wedge support ring (if applicable) - check
the grab wedge is undamaged.
Insert the grab wedge into the fitting with the flat face against
the wedge support ring. Replace the cap hand tight.
DO
Check
the fitting and components are clean.
Lubricate
'O' ring before re-assembly of joint.
Replace
end cap and tighten by hand.
DON'T
Keep
new grab wedges loosely amongst tools or pipe fittings. To avoid
damage store in a separate compartment or container, similarly
with 'O' rings.
Under
NO circumstances should fitting components be individually
fitted onto the pipe prior to assembly. It is important that
components are correctly located and the Hep2O®
fitting properly assembled prior to the insertion of the pipe.
Remember:Hep2O®
fittings are designed to push fit only and are NOT
compression fittings.